I want to give you guys good news on our progress but I just cant seem to be able to, and its frustrating!
So since the last post, I was at the house just looking at the workmanship of the tradies that come through to the house to work. I've managed to pick up another error regarding the heating/cooling zoning in the house. So we've requested to have an All bedrooms zone A and the remaining of the house zone B option, its something we believe that we should have so that we can keep the cost of heating lower during the colder periods of the year. Because the Master Ensuite was on ground level, we have had to install an additional zone thermostat to the upper level so that the kids can access the system without having to come downstairs to adjust the temperature. This whole zoning thing was so complicated for us that we spent 2 weeks with out BC just working it out with her. So because all the bedrooms were in a single zone, the duct work for this option was slightly complicated. An additional duct had to be run down into the Master Ensuite so that it will be connected to the same duct work as the rest of the bedrooms.
I managed to spot the error that the duct had not been constructed this way, but rather All upper floor as zone A and all ground floor zone B. This completely defeats the purpose of us zoning up the house for the bedrooms to be connected so that only zone A will be switched on when all of us are in our rooms resting.
Brought the issue up to our SS and he tells us that it's fine and ensured us not to worry about it.
Last friday 23rd Nov 12 I drove past and saw that there were the heating/cooling guys working and they advised me that they've constructed the ducts wrongly! It goes to say that our SS had no idea that it had been wrong the whole time and he'll rather just ensure me that its fine and fix the mistake later - hoping we won't know about it.
Thank God its all getting fixed and I can have a peace of mind in this area for now.
Our SS was away until the 12 Nov 12. But while he was away, very minimal work was completed. We had our corner windows installed on the 9th November 12.
Master Ensuite: 9th November 12 |
9th November 12 |
Activity Room: 9th November 12 |
Scaffolding sticking into window space |
Uninstalled glass |
19 Nov 12 |
19 Nov 12 |
I just hope Hebel can at least be completed by this coming week!
Some very strong crawling bamboo from the previous owner. It had not died even after we knocked down the house. Any tips on killing them? |
Insulation Batts: 22nd Nov 12 |
Batts for the external walls |
Our full tile up to ceiling feature in the Master Ensuite |
Located directly above our stairs. |
I hope the electrician will be back to fix these up |
Our house 24th November 12 |
Until next time!
Hi,
ReplyDeleteThis is really dissapointing news but I just hope PD are able to start again quickly to finish off plaster before the Christmas break. By the way who was your site supervisor ? Ours also told us that she was leaving and her last day at work was Friday 16th of November. Probably not a good idea to post names on a blogsite so would be pest if you PM me on my gmail address: mahesh.p.iyer@gmail.com
Cheers
Hi,
ReplyDeleteWe are also seriously considering the sandringham 45. Just a few things:
Have you considered the heat loss that will occur through the beautifu void area in the kitchen area? Who are you dealing with in PD?
Please contact me:
navsharma73@gmail.com
Hi,
ReplyDeleteSorry I deleted your e mail by accident. How are you getting the wiring for your hometheatre done? are you getting it done by yourself?
navsharma73@gmail.com
Hi Navneet,
ReplyDeleteI hope you have already decided to build a sandringham by now. Sorry but I haven't checked the comments section lately.
The house has a 6 star energy rating as a requirement by law for new homes being built now. The heat loss and cooling will depend on your siting and the rising and setting of the sun. We have a beautiful evening sun in the kitchen area and thus we werent too concerned about not having enough heat in the area. But fair point regarding the loss of heat. If you would like to, you could upgrade your insulation to the house? increase it from 2.5 to something higher?
We dealt with the sales consultant at harcrest. Hes an awesome bloke and will be willing to help you out for sure.
Wiring for the home theatre will be done after handover. PD will charge you if you want it done by them.