10 DAYS TO HANDOVER

Just had our pre-handover inspection by our private inspector last thursday before the Easter weekend. 
Got the report this morning and theres nothing major to report! Hooraaayy!! 
These are some of the things to report:
Master Ensuite Vanity needs caulking
Excess motar on balcony facade
This is not a tiled facade balcony just like the display homes. This is just a standard James Hardie Axon Cladding. 400mm spacing. Apparently their first time installing it. Beware of workmanship standards if anyone is thinking of keeping the facade standard. Its mostly good, but make sure you follow up with the SS to ensure adequate weather sealing.
27th March 13
Painting to be finished on rendered internal garage wall
27th March 13
Fixing hole in garage wall
28th March 13
Completed garage wall fix
SS instructing on a door not to throw out excess building material
Finish on the garage access door
Peter Limburg stated in his report that the garage floor needs to be clean from all debris that includes excess mortar or colour stains. He suggested that maybe we need to get the floor professionally cleaned and even painted if necessary - all on the builder's cost. We should not be accepting 'defective' garage floors if they are damaged. This is as per the building regs.

We have our Master Ensuite on located on ground floor, and it had not been ducted externally. The moisture from the shower is now just going to flow into our floor joists above ground level. It must be vented as per Australian Building Code Paragraph 3.8.5.0. SS says that he will look into it and get back to us, he knows that it has to be vented externally. Not sure why it had not been factored into our drawings in the first place.

SS also confirms that he will get a thumb turn lock installed onto our Pivot door instead of our deadlock thumb lock. No deadlock on the door, but the reason why we wanted it was so that we don't have to use a key to lock the deadbolt. The thumb turn lock will allow us to do this. Another house that is currently building by PD has the exact locks and fixtures we initially wanted! But I figured that it will be too much of a hassle to get the SS to change the entire door.. Seems like this new SS had just been telling me stories about how they don't use the paradigm square lockwood deadbolts anymore due to faulty reasons....
22nd March 13 
Completed Bolero Flooring
Scotia had to be used for our flooring
Some don't like it, but I personally don't mind
Not sure what the process is with regard to the footpaths belonging to the council. They have been damaged during the construction of the house and PD office has told me that they will be fixing them after handover. I don't want to get caught in the horror of PD not coming out to fix them after they've received their final handover payment! I requested for a typed letterhead from the office stating that they will fix the footpaths, but they've refused this request. Will try again to get the letter on the day of handover. I got a letter from the council today stating that the Yellow marks on the footpath have been indicated by them. Seems like there has been extensive damage to it during the construction. PD better be paying for the repair... or I will lose my asset protection bond.

Our crossover application has been approved. We're going to request for a 4.5m wide crossover and re-instate the previous crossover on the property. It's currently located at the rear where our backyard is. Probably going to leave it on until we get our landscaping completed. Easier access for the bobcat and dingos, when they construct our retaining walls. 
Damaged council footpaths marked with yellow spray paint 
Dispensation application
We're still waiting from the council regarding our dispensation application for the retaining walls on the side of the property and also the fencing to the side of the property. Building regs don't allow for more than 1m high fence within 9m of an intersection. We have requested for a 1.4m high retaining wall to be built within this 9m zone as the slab is currently exposed... the retaining wall will prevent any undermining of the soil under the slab. Also, the current height of the house is quite high above the footpath, building regs only allow for a 1.8m fence to be constructed without a dispensation application, we need a 2.7m high fence at least to account for 1m retaining walls (so that we can have a small footpath on the side of the house) and fencing privacy. 
Hopefully the council allows our application!
Proposed fenced area
Since my previous post, I was finding out what shower screens the Porter Davis Prestige inclusions provide. My BS confirmed that the shower screens to the entire house as part of the prestige inclusions is Stegbar's Softline series shower screens. Stegbar Grange series is considered "frameless" for PD. Our prestige inclusions 2012 is a "semi-frameless" shower screen. 
Both display homes for the Sandringham 45 use "frameless" shower screens in the Master Ensuite. You will not be receiving this if you didn't upgrade the shower screen!
Grange Series
Softline Series
Our Softline Shower screen
Shower Grates in all bathrooms
Shower Grates in all bathrooms
Shower grate doesn't come with slots in the grate. Theres a tiny gap between the tiles and the metal strip when the strip is fitted, which water will flow through. Don't expect something like this:
The grates are already an upgrade...the display homes use a standard circular waste outlet in the center of the shower.

I was also looking into the sink pop-up waste plugs. This is what we have installed at the moment:
Undercounter sink
Caroma Cube 500 under counter waste plug
Bought waste plugs like these from Masters
For some odd reason the entire house came with pop-up sink waste plugs except for our Caroma Cube 500 undercounter sinks in our Master Ensuite. It just comes with a permanent stainless steel fixture which water can flow through to the waste outlet. Theres not pop-up sink plug that can stop water from flowing through - just a tiny silicone rubber plug that sits On Top of the steel fixture. Anyway, I can't be bothered to get the SS to change the the outlet for us into pop-up plugs, so I bought some from Masters for $14. They are larger than the normal ones and they look much better!! Will upload photos when I've installed them.   



Completed waterproofing of garage wall
This gutter waste outlet is too high in my opinion (white section)
Will be asking SS to have a look at it
The day the flooring guys were working on our Boleo floors only left the house at 7.30PM! It was almost dark and when I drove past, I saw that there was a van trying to get out of the property. It was stuck in this mud hole for almost an hour before RACV came to the rescue. Looks like this contractor has learnt his lesson - Do not park on areas which have not been designed for parking! 
No idea whats so hard about just parking on the street....Why do they have to park on the soft muddy area..Not only they may get their vehicles stuck in it. They bring along with them muddy shoes INTO the house.
Massive hole at the front of house
As of today:

28th March 2013
Got a call from our BC this morning informing us that a Building manager has gone onto our site to have a look at our powder room tiles situation. She wanted to confirm where had we seen the display home tiles. I told her Harcrest, and she says she'll call the building manager ASAP, and he's going to have a look at our house and then the display home.
Later in the afternoon, I got a call from a building manager I believe, and he says that they might be able to fix our tiles...but he will have to speak to the group manager tomorrow (Wednesdays - when PD have their weekly meetings) and will keep me updated. Looking positive... 

It doesn't make sense to go to a car dealership, fall in love with a display car, pick out the new car, upgrade all its features, order it, and when you receive it, find that they had installed 2 small windscreens onto the car instead of a 1 single entire piece. Then get the salesman tell you excuses that they don't make the cars like the ones on display...

Get it fixed for us, and we'll be raving to others about our entire build! Nothing else had been an issue for us until now (apart from the void issue). 
No fix and I'll definitely be telling potential PD customers my honest opinion that ALL is good except you might not be getting what you've upgraded for....sad but true. 

Fingers crossed we get the tiles fixed and we still move in next week! Will keep you guys updated!! 

Our PCI with SS is this Thursday! 4th April! 

1 comment:

  1. Looking REALLY nice... love your colours.. did you get PD to do the feature walls?

    The shower drain is nice.. .expensive upgrade with M*tr*0n .. nice to see that is what PD have moved to. Can the metal strip be removed to clean?

    I have the same sink and noted your post on the plugs... masters here I come...

    Hope ur PCI went Well

    ReplyDelete