And we are POURING!

Waking up at 6am and going out to site to watch the pour can be exciting! Except when the pour has been delayed by another 1.5hrs! Not 7am now, rather 8.30am!
Tingmore structures was able to come out to assist with the pouring process. The foreman commented that not many structural engineers come out on site and that they should do more often! Thumbs up for Tingmore structures for sending someone out!
He's been on the concrete board of Victoria and he has worked on countless commercial projects. "Today is a perfect day for this pour" - Tingmore

The chairs have been finalised. 
Steel re-enforcements have been placed in right places and the membrane fixed! Procon, you're doing an excellent job!

Concrete will be poured and slab will be levelled and I'll have a slab by 5pm today!

Here are some of the photos from the morning:


Trucks arriving at 8.30am SHARP
Pump came earlier, 7.30am


Pouring commences

"this garage is HUGE" - Tradie


A relatively busy site


More updates later in the evening..


Final Inspect Photo 

Final Inspect Photo - looking at rear

Final Inspect Photo- Looking at Garage

Final Inspect Photo

Looking to front from rear

Garage wall

Garage wall

Master Ensuite 

Soaker Tub Ensuite

Soaker Tub Ensuite Outlet