Monday morning! Beautiful day today! 
Guess what, theres activity!

Final Inspect has managed to get in contact with our SS and found out that Procon is doing our whole concrete job. He has managed to find out who will be in charge at site for the concrete pour and set a time to meet them later in the afternoon. 

I managed to have a chat with the concreting tradies as I was dropping my children off at school and it appears that Procon cannot box up the garage area as our neighbour's fence is in the way. He's advised that it needs to come down before any boxing can start around that area. His supervisor Matt is on it and hopefully they can finish their task by late arvo, or else the pour will be pushed back again.




3.15pm
Got a call from our SS, and he's advised that Procon was NOT able to finish their work today. They will have to come back again tomorrow and push the concrete pour to Wednesday! 
Final Inspect has also rescheduled his appointment to meet these concrete guys tomorrow at 12pm.

Garage side engineering Retainer wall.
As you can see, right above it, our neighbour's
fence has been removed.

I went out to site to have a look at their work and realised that some of the pipe (could be drainage) are not within the boundary of the slab. Pink pipes are downpipes and they will be on the exterior of the slab box, but there was a single pipe which was outside of the slab. I believe it could be the ensuite bath's outlet.


Pipe with the pink ring around it is OUTSIDE of the slab. 



1 comment:

  1. Hi,

    Good luck with your build. We are about to start our process (PD Sandringham 45) in Burwood in around 2 months so really keen to see how yours is progressing.

    Cheers,

    MP