Im quite interested as to whether they follow the engineering drawings and ensure that all the bore piers in the drawings have been constructed. Its interesting how the waffle slab will just 'sit' on top of these piers!
Wouldn't the whole slab just 'SLIDE' off the piers if there is a heavy rain pour?
Engineering Drawing for Slab |
View from the Garage |
Garage and facing the master ensuite area |
Left over concrete? |
More Piers |
Not sure why they haven't filled these holes |
Piers on the boundary line (garage side) |
Garage Engineering Retainer wall |
Garage Engineering Retainer wall |
No comments:
Post a Comment